Application: AEE LIDL Targu Jiu Project delivered: BK 008, 400kVA, 20/0,4 kV fully equipped + BK 36-15, 20/0,4 kV
Application: AEE LIDL Targu Jiu Project delivered: BK 008, 400kVA, 20/0,4 kV fully equipped + BK 36-15, 20/0,4 kV
IInd place in National Top of Companies 2016, Large Enterprises category.
During Electro Sistem Days event, took place the launching of the 8th album, whose initiative and financing belong to Electro Sistem group.
This year as well, ELECTRO SISTEM and B&K ELECTRO SYSTEM won the 1st place in the Maramures County Top of Companies realized by the Chamber of Commerce and Industry Maramures.
ELECTRO SISTEM successfully registered ESTO trademark in Ukraine, aiming at expanding the company’s interests on this market as well.
On Wednesday, 01.06.2016, B&K Electro System, inaugurated a new production unit in Nistru, for manufacture of electricity control and distribution apparatus.
Under the pressure of market competition companies face an increasingly strong need for specialists, directly and costly experiencing the autonomous and discrepant approach of education. Between high school and university education on one side and employers on
| Application | Project delivered | |
| 2015 | ||
| Dedeman, Timișoara | BK 58-24 IE, 630kVA, 20/0,4kV | |
| Fial Imobiliare, Bacău | BK 75-26 IM 2x400kVA, 20/0,4kV | |
| PFV, Agigea | BK 85-25 IE, 630kVA, 20/0,4kV | |
| E.On Gaz, Tg. Mureș | BK 69-24 I | |
| Auchan, Deva | BK 54-24 IE, BK 50-25, 2x1600kVA, 20/0,4kV | |
| Aee Primăria Jilava | BK 012 IE, 400kVA, 20/0,415kV | |
| Aee Muzeu Mixt, Tecuci | BK 40-22 I, 160kVA, 20/0,4kV | |
| Aee Penny, Tecuci | BK 39-23 I, BK 23-23, 250kVA, 6/20/0,4kV | |
| Hotel Mangalia | BK 62-24 IE, 250kVA, 20/0,4kV | |
| Aee Rezidential West, Ilfov | BK 012 IE, 630kVA, 20/0,415kV | |
| Aee Lidl Bucureștii Noi, București | BK 60-24 IE, 400kVA, 10/20/0,4kV | |
| Aee Maxam RO fabrica explozibil, Făgăraș | BK 45-26 IH, BK 007 I, 630kVA, 20/0,4kV | |
| Blaxxy Resort, Olimp | BK 54-24 IE, BK 002, 630kVA, 20/0,4kV | |
| Aee Penny, Corbeanca, Ilfov | BK 60-24 IE, 250kVA, 20/0,4kV | |
| Reabilitare stație compresoare Mina Sărată Monteoru, OMV Petrom | BK 54-23 H, 630kVA, 20/0,4kV | |
| Aee Spital Județean Ilfov | BK 90-25 IES, 2x800kVA, 10/20/0,4kV | |
| Aee Penny Market, Ploiești | BK 004 S, 250kVA, 20/0,4kV | |
| Stație epurare, Ineu | BK 58-24 IE, 400kVA, 20/0,4kV | |
| Olitex, Focșani | BK 50-27 IS, 160kVA, 20/0,4kV | |
| Star Transmission MBZ, Cugir | SIK 103-28 I, 2x2500kVA, 20/0,4kV | |
| Mega Mall + Carrefour, Timișoara | BK 82-23 IE, BK 009, 1600kVA, 20/0,4kV | |
| Stație pompare, Roman | BK 35-23 I, BK 55-23, 2x1000kVA, 20/0,4kV | |
| Aee Forja Compa, Sibiu | BK 89-30, 1000kVA, 20/0,4kV + 3500kVA, 20/0,765kV | |
| Aee Penny Velenta, Oradea | BK 72-26, 250+630kVA, 20/0,4kV | |
| Aeroport, Suceava | BK 62-24 I |
| Application | Project delivered | |
| 2014 | ||
| Trewidland, Trequite, Clawdd Ddu, Eversham, Foxburrow Projects “ England | 23 prefabricated compact substations in metal enclosure internally operated on SIK 76-29 IR chassis with transformer 1650kVA and inverters, for photovoltaic parks in England | |
| Eurobussiness Industrial Park, Oradea | Prefabricated substation in concrete enclosure, externally operated, type BK50-27I, 630kVA, gage 800kVA, 20/0,4 kV, fully equipped + SCADA | |
| Aee RCS-RDS Galați | Prefabricated substation in concrete enclosure, externally operated, type BK002, 400kVA, 20/0,4 kV, fully equipped | |
| Aee Teatru Severin | Prefabricated substation in concrete enclosure, externally operated, type BK90-27, 2x1000kVA, 20/0,4 kV, fully equipped | |
| Industrial park, Budapest, Hungary | Prefabricated substation in concrete enclosure, internally operated, type BK007I, fully equipped |
| Application | Project delivered | |
| 2016 | ||
| Stația Station, Bihor |
4pcs Medium Voltage Air Insulated Double System Switchgear type ZK8plus L2 800(1250)A.
They connect “Curcubata Mare” Wind Power Park (12.5MVA) to National Network
|
|
| AEE Oarja, Pitești |
BK 65-23ZM, 1000 kVA, 20/0,4 kV, fully equipped
|
|
| AEE Indcarf, Pitești | BK 41-15, 20/0,4 kV, 4 medium voltage switchgear and SCADA | |
| AEE, Pitești railways station | BK 62-16M, 20/0,4 kV, fully equipped | |
| Baia Sprie II Power Station | Medium voltage primary distribution switchgear ES02 Plus – 15 units | |
| Chimpex (Constanța Port) | A series of medium voltage switchgear: type ES-01-I-24(6)-630, 24(6) kV, 630 A, 16 kA (1s), type ES-01-I-24(6)-630, 24(6) kV, 630 A, 16 kA (1s), type tip ES-01-Ms-24(6)-630, 24(6) kV, 630 A, type ES-01-I-24(6)-630, 24(6) kV, 630 A, 16 kA(1s), type ES-01-R-24(6)-630, 24(6) kV, 630 A. |
Archives: 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
In december 2015, Electro Sistem finalized another cutting edge investment for the production activity, partially financed by Programul Operational Sectorial ‘Cresterea Competitivitatii Economice’, a new testing laboratory.
Since 2006, around winter celebrations, Electro Sistem opens the doors to its Romanian and foreign partners.
Made by ELECTRO SISTEM according to DY595 standard, TYPE: ESTO-SAV-24-400
Medium voltage cubicles for switching substations and transformer substations ES-01 Plus cubicles are medium voltage air insulated switchgear, with SF6 switch disconnectors and vacuum circuit breaker,
Since September 2015, you can find us on Facebook also. ESTO is our trademark. It means recognition of knowledge and expertise in products and manufacturing processes, it
The 24 kV fuse base, produced by Electro Sistem, delivered optionally with zinc oxyde surge arresters are designed to be used in 24 kV medium voltage overhead power lines,
Medium voltage cubicles according to ENEL requirements Electro Sistem manufacture the full range of medium voltage cubicles
| Application | Project delivered | |
| 2002 | ||
| Italsofa Baia Mare | Connections station SI 70-24 | |
| ARA Romania, Valea lui Mihai | Prefabricated substation in concrete enclosure BK49-23, 2í—1000 kVA | |
| Eco Kapa, Rosiori | Prefabricated substation in concrete enclosure BK006, 1000 kVA |
Archives: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
| Application | Project delivered | |
| 2003 | ||
| The State Theatre of Oradea | Prefabricated substation in concrete enclosure BK53-23, 2í—630 kVA | |
| Europa Hotel, Eforie Nord | Prefabricated substation in metal enclosure SIK 52-23, 2í—2000 kVA | |
| Orange Romania, Bacau | Prefabricated substation in metal enclosure SIK002, 630 kVA |
Archives: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
| Application | Project delivered | |
| 2004 | ||
| Roweni Industrie Odobesti | Prefabricated substation in metal enclosure SIK 70-25 I, 2 x 1000 kVA | |
| Romaqua Group “ Busteni factory | Prefabricated substation in metal enclosure SIK 35-23, 2í—800 kVA | |
| Coca-Cola HBC Romania “ Poiana Negri production site | Prefabricated substation in metal enclosure SIK 75-26 I, 2í—2000 kVA |
Archives: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
| Application | Project delivered | |
| 2005 | ||
| Emerson engine factory, Stefanesti | Prefabricated substation in metal enclosure SIK 54-23 2x630kVA | |
| NATO base, Tg. Mures | Prefabricated substation in concrete enclosure BK 67-35 I, 2í—630 kVA | |
| Bricostore Brasov | Connection point in concrete enclosure BK 22-23 |
Archives: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
| Application | Project delivered | |
| 2006 | ||
| Baumax Cluj Napoca | Prefabricated substation in concrete enclosure BK54-23 2x400kVA | |
| DNA Bucharest head office | Prefabricated substation in concrete enclosure BK002 250kVA | |
| Comtim farms, Timisoara | 30 Prefabricated substation in concrete enclosure BK001 100kVA | |
| Passage to 20kV Timisoara, Arad | Prefabricated substations in concrete enclosure, ES 01 medium voltage cubicles | |
| Civic centre Bucharest | Prefabricated substation in metal enclosure SIK 85-23 2x1600kVA | |
| Urbis Baia Mare, trolley bus | Station cubicle unit |
Archives: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
| Application | Project delivered | ||
| 2007 | |||
| Mercedes Bacau Showroom | Prefabricated substation in concrete enclosureBK008 630KVA | ||
| Real Cluj ,Deva, Timisoara, Arad,Oradea | Cubicle unit ES 01 range | ||
| Alba Iulia shopping mall |
|
||
| Rombat Bistrita | Prefabricated substation in metal enclosure SIK 47-24H 1600kVA | ||
| Romgaz head office, Medias | Connection point in metal enclosure SIK 53-24I with ES-01 range cubicles; prefabricated substation in metal enclosure SIK 48-26 2 x 1600kVA | ||
| CRH Jimbolia factory | Prefabricated substation in concrete enclosure BK71-23 3x1000kVA |
Archives: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002