{"id":626,"date":"2015-06-22T09:47:24","date_gmt":"2015-06-22T09:47:24","guid":{"rendered":"http:\/\/electro-sistem.com\/?p=626"},"modified":"2016-06-17T12:34:20","modified_gmt":"2016-06-17T12:34:20","slug":"consultanta-2","status":"publish","type":"post","link":"http:\/\/electro-sistem.com\/en_US\/consultanta-2\/","title":{"rendered":"Consulting and design"},"content":{"rendered":"<p><strong>Consulting references<\/strong> Connection to SEN of MHC Repedea, Repedea, Tomnatec Valey, Maramure\u0219 county; Connection to SEN of a CHE group located on Vaserul Mijlociu, Vi\u0219eul de Sus area, Maramure\u0219 county; Connection to SEN of hydro energetic disposal, S\u0103p\u00e2n\u021ba river, Maramure\u0219 county; Connection to SEN of photovoltaic power plant Parta, 1-8, jud. Timi\u0219. <strong>Design references<\/strong> Power supply unit &#8211; SC UNIVERSAL ALLOY CORPORATION EUROPE SRL aluminium profile factory in Dumbravita, Maramures county; Power increase at SC ARAMIS INVEST SRL, Maramures county Low and medium voltage and 110 kv power lines relocation and\/or protection &#8211; Targu Mures, Cluj, Zalau, Oradea, Bors motorway; Power supply unit \u2013 Gold Plaza shopping centre, Baia Mare, Maramures county Improvement of urban public transportation byexpanding the trolley bus network and its related infrastructure &#8211; Baia Mare, Vasile Alecsandri quarter; LIDL supermarket power supply unit &#8211; Baia Mare, Baia Sprie, Tg. Lapus, Sighet, Bistrita, Satu Mare, Tasnad, Campia Turzii, Gherla, Cluj, Sebes, Aiud, Sibiu, Avrig, Tarnaveni, Targu Mures, Ludus, Reghin; Cora multifunctional centre power supply unit &#8211; str. Milcov, nr. 2-4, Bacau; MHC connection to RED &#8211; Raul lui Vlad, Caineni, Raul Vadului village, Valcea county; Photovoltaic unit connection to SEN &#8211; lot 1-8 Parta, jud.Timis; Expansion of the power distribution networks throughout the ARC PARC DEJ industrial park for the sustaniable development of certain new economical activities and also the generation of premisses to develop a renewable solar and photovoltaic based power plant throughout the park by facilitating access to the network; Connection to RED of the Stejera photovoltaic park &#8211; Miresu Mare, Stejera village, Maramures county; Connection to RED of the Spria Technology photovoltaic park, Baia Sprie, Maramures county; Retrofit 20kV switchgear for a 110\/20 kV substation in Salonta, Bihor county.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Consulting references<\/strong> Connection to SEN of MHC Repedea, Repedea, Tomnatec Valey, Maramure\u0219 county; Connection to SEN of a CHE group located on Vaserul Mijlociu, Vi\u0219eul de Sus area, Maramure\u0219 county; Connection to SEN of hydro ener&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[27],"tags":[],"_links":{"self":[{"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/posts\/626"}],"collection":[{"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/comments?post=626"}],"version-history":[{"count":23,"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/posts\/626\/revisions"}],"predecessor-version":[{"id":1943,"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/posts\/626\/revisions\/1943"}],"wp:attachment":[{"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/media?parent=626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/categories?post=626"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/electro-sistem.com\/en_US\/wp-json\/wp\/v2\/tags?post=626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}